Compliance
Export control decides whether the machine may leave China. Market access decides whether it may be sold where it lands. They are checked by different authorities, for different reasons, and neither one substitutes for the other.
Rule 01 · Export control
A 3,000 W continuous wave unit and a 200 W pulsed unit are not on the same side of this line. That surprises buyers who assume the higher power is the harder one.
For neodymium-doped lasers in the 1,000–1,100 nm range, the dual-use entry applies where several conditions hold together: pulsed excitation with Q-switching, pulse duration at or above 1 ns, and output above the single-mode or multimode threshold. Continuous wave units do not meet that combination. Pulsed units frequently do.
The consequence is procedural, not technical. A controlled unit needs a licence before shipment; the licence is issued per end user and per shipment, and the end user must undertake not to transfer the equipment to a third party.
That last condition is what decides the commercial structure, and it is why we ask whether a distributor intends to operate the machine or resell it.
| Stage | Typical duration |
|---|---|
| Provincial initial review | About 5 working days |
| Central review | Up to 45 working days; verification time not counted |
| Licence issue | About 3 working days |
| Total, realistic | Eight to twelve weeks |
Durations are indicative and set by the reviewing authority, not by us. Contracts that exclude the licensing period from the delivery date are the difference between a delay and a breach.
Structures that work
The licence structure, not the price, decides whether a distributor can hold stock. This is worth settling before the first order is negotiated.
Each shipment is licensed against a named end user with a non-transfer undertaking. Workable for project sales and for service companies operating the machines themselves.
The distributor is the end user: it buys to use, not to resell. This is usually the cleanest route for a rental fleet or a service business, and it needs to be stated that way from the start.
Where the exporter qualifies, a general licence can cover multiple shipments over a period of one to two years. It restores something close to stock availability — and takes time and a track record to obtain.
Test evidence
The machines we supply are CE-tested as a product family by an accredited third-party laboratory in Shenzhen. Reports were issued in May 2026 against the harmonised standards below. Where you take private label, the Declaration of Conformity is issued under your brand with this evidence behind it.
| Scope | Directive | Standards applied |
|---|---|---|
| Electromagnetic compatibility — emissions & immunity, industrial environments | 2014/30/EU (EMC) | EN IEC 61000-6-2:2019 · EN IEC 61000-6-4:2019 · EN IEC 61000-3-2:2019+A1:2021+A2:2024 · EN 61000-3-3:2013+A1:2019+A2:2021 |
| Machinery safety — risk assessment, electrical equipment, laser processing machines, laser product classification | Machinery Directive | EN ISO 12100:2010 · EN 60204-1:2018+A1:2025 · EN ISO 11553-1:2020+A11:2020 · EN 60825-1:2014+A11:2021 |
Family coverage spans the continuous wave series from 1 to 6 kW and the pulsed series from 100 to 3,000 W, including every configuration listed on our Products page. Report copies and the Declaration of Conformity draft are sent with a quotation — they are not published on this site.
Rule 02 · Market access
For the United Kingdom, CE marking continues to be recognised, and UKCA remains voluntary for most machinery — a parallel UKCA certification is not required to sell there. Northern Ireland is the exception, where CE or UKNI applies.
For the European Union, Regulation (EU) 2023/1230 replaces the Machinery Directive from 20 January 2027. It adds obligations that matter for laser equipment: cybersecurity, software treated as a safety component, digital instructions, and rules on substantial modification. A UK instrument takes effect the same day.
Machines placed on the market before that date may continue, but a technical file written to the old directive will not support a machine sold after it. If your programme runs past January 2027, the file has to be written for the new regulation now.
Before quotation
Not "we will handle it". A written position, per configuration, before a price is agreed.
| Question | What we provide |
|---|---|
| Is this configuration controlled? | Working mode, pulse characteristics and beam parameters stated against the control criteria |
| If controlled, which structure? | End-user, self-use or general licence — with the commercial consequences of each |
| What documentation ships with it? | Technical file, declaration, manual language, customs declaration parameters |
| What is the realistic timeline? | Licensing period and shipping lead time stated separately, not merged into one date |
Send the configuration and the destination. The answer comes back in writing, with the criteria it was assessed against.